Recreation, Culture + Education: Emerging Projects

Emerging Projects

Project Name Description
REC – 900 Innes Park Located in the Bayview-Hunters Point neighborhood of San Francisco, the 900 Innes property was acquired in 2014 for three million dollars. The 900 Innes Park Planning Project presents a unique opportunity to unite the historic boatyard of 900 Innes and the underutilized India Basin Shoreline Park into one park, to complete 1.5 miles of accessible shoreline linking to the Bay Trail and the Blue Greenway, and to foster better neighborhood accessibility to the water. This project will give the community eight acres of waterfront open space.
REC – Camp Mather Master Plan Located near Yosemite National Park, Camp Mather is a family camp covering 337 acres, and includes a pool, lake, tennis and basketball courts, staff housing dormitories, kitchen and dining hall, and over 100 rustic camps that serve as guest accommodations. This revenue-generating site is heavily used and a long neglected resource. Significant improvements are needed to existing structures, including a modern wastewater treatment facility to meet current environmental standards. A Master Plan, including environmental review, would help guide the improvements needed.
REC – Civic Center Plaza Modernization This modernization would involve development of a conceptual plan and environmental review to modernize Civic Center Plaza as part of the Civic Center Commons initiative and the Civic Center Public Realm Plan.
REC – Geneva Car Barn Enhancement The Geneva Car Barn Enhancement Project includes renovation of the Powerhouse and Car Barn. This project will include a seismic upgrade, installation of modern utility systems, restoration of historic features, hazardous materials remediation, and new circulation systems to accommodate ADA access. Additional improvements for the Powerhouse include streetscape improvements, improved entrances, new roof, restored windows, mechanical and electrical systems upgrades, new floors, and radiant heating. The renovated Car Barn will comprise over 20,000 square feet and include space for new art studios, a cafe, an event space, a theater, a community meeting room, a student lounge and visitor-serving retail space.
REC – Golf Course Improvements Significant facility upgrades are needed at the City's golf courses. The Lincoln Park golf course needs netting along Clement Street, a new or refurbished clubhouse, a new perimeter fence and a rehab of the entire course. Most other courses within the City, including Sharp Park also require substantial upgrades, with the exception of Harding Park, which was recently updated.
REC – Japantown Peace Plaza Surface Improvements Resurfacing is needed at Japantown Peace Plaza to improve plaza surface and remove water intrusion from the subsurface garage.
REC – Kezar Pavilion Seismic Upgrades Based on an engineering study, Kezar Pavilion has significant seismic deficiencies causing safety concerns for staff and public use.
REC – Marina Yacht Harbor Renovation Renovation is needed at the Marina Yacht Harbor, on both the waterside and landside. Waterside marina renovations would include installation of a new breakwater, removal of existing breakwater structures, reconstruction of portions of the riprap slopes, replacement and reconfiguration of the floating docks and slips and maintenance dredging. Landside improvements would include renovation of the existing harbor office into restrooms, adaptation of the degaussing station into a new harbor office, and parking and landscape improvements.
REC – McLaren Lodge Seismic and Code Upgrades John McLaren Lodge, situated at the entrance to Golden Gate Park, requires seismic improvements including improvements to the newer annex (a two-story administrative building directly behind the Lodge), the breezeway which connects both buildings, and an ADA-compliant elevator.
REC – Neighborhood Parks - Recreation Centers Recreation centers, including Potrero, Mission, Gene Friend / SoMa and St. Mary's Recreation Centers, are in need of renovation for seismic safety, upgraded access, replacement of failing structures, systems, and play features.
REC – New Park Acquisitions and Capital Development Needs REC recently acquired property at Francisco Reservoir and Schlage Lock, and is in the process of acquiring the 11th Street Properties located in western SoMa. Planning and design is expected to begin in 2017, with construction slated for 2024, but funding needs remain.
REC – Park Concessions REC has several revenue generating properties that are in need of capital improvements. Without needed renovations, the operations and revenue generation at these sites may be jeopardized. In addition, REC is interested in re-purposing existing structures so that they can have a dual purpose that includes the provision of park-serving amenities.
REC – Regional Park Improvements This project would renovate and improve park features at Golden Gate Park, McLaren Park and Lake Merced, including restoration of natural features and recreational assets, as well as improving connectivity and access. The 2012 Neighborhood Parks and Open Space G.O. Bond funds some of the needs at these parks, but aging infrastructure, roadways and water features will require other funding sources.
REC – Sharp Park Wetland Restoration This project would improve the habitat for special status species, such as California Red Legged Frogs and San Francisco Garter Snakes, at the Laguna Salada Wetland Complex, by creating an additional 19 acres of habitat and re-establishing the connection with Mori Point.
REC – Twin Peaks Figure 8 Redesign A planning effort is underway to evaluate design options for the portion of the Twin Peaks roadway adjacent to, and between, the two peaks and the Christmas Tree point parking entrance. The objectives of this project are to create safer connections to Twin Peaks Trail System, improve pedestrian and bicycle access, and provide a defined connection to the Bay Area Ridge Trail. Funding for the current phase is provided by a Priority Conservation Area grant, Proposition K Transportation Improvement funds, and the 2008 Clean and Safe Neighborhood Parks G.O. Bond, but additional funding is needed.
REC – Water Conservation Program Despite successful water conservation and irrigation upgrade projects at Balboa Park, Jefferson Square, Alta Plaza, and Moscone Playground, there still remains a substantial need to bring all of the City’s parks up to the modern standard for water conservation.
REC – Zoo Improvements The Zoo is currently undergoing a Master Planning process to analyze current capital needs. While the western side of the Zoo has seen significant improvements in recent years, there are many structures that still need repair, including the Mothers Building. Approximately $400,000 in funding was identified for the Mothers Building in the current budget; however, an outstanding need remains. On the eastern side of the Zoo, substantial work is needed to renovate the lion house and bear grottoes along with the other original structures from the 1920s and 30s.
AAM – Asian Art Museum Transformation Project The Asian Art Museum is in the early phases of planning a set of changes that will add significant space for major exhibitions, expand and modernize classrooms, and re-contextualize permanent collection galleries. This project will feature a 12,000 square foot pavilion – a large space capable of supporting the dynamic and large-format artworks commonplace in exhibitions today. The pavilion will sit atop an existing wing on the Hyde Street elevation, and add about 9,000 square feet of gallery space to the first floor. The classrooms, which currently serve around 35,000 students per year, will be expanded and updated with state of the art audiovisual systems. This project will be fully funded by private donations from the Asian Art Museum Foundation.
ARTS – Renovation of the City’s Cultural Centers If the City is able to fund the Cultural Centers Facility Master Plan, this project will address the needs that are identified.
OEWD – Old Mint Restoration Project Cost estimates for the completion of the Old Mint Restoration Project – the City’s effort to transform the landmark United States Old Mint building into a new, destination cultural facility – are approximately $100 million. A more complete and detailed financing plan will be developed through the Phase I evaluation period, presently underway, but this total project cost will be met with a mix of local, state, and federal funding sources. As currently developed, the proposed Community Benefits Package from the City’s Central SoMa Plan includes a major investment in the Mint’s restoration. This local funding, generated from assessments of the plan area’s Community Benefits District, will be leveraged to raise additional public and private support. Additionally, the Phase I assessment will examine the use of Historic Preservation Tax Credits and General Fund debt financing tools to complete the project’s funding. Developed in collaboration with the California Historical Society, the City’s official partner on the project, the Phase I evaluation will also produce a campaign feasibility analysis exploring the market for private and philanthropic participation in the project.
LIB – Branch Improvements at Ocean View branch library After the Chinatown and Mission branch library renovations, the Ocean View branch library would be the final branch renovation project. Initial project funding will cover planning and pre-development costs, including a community engagement process.
LIB – Satellite Library Locations As the City population continues to grow, and new developments such as Treasure Island and Candlestick Point are completed, the Library will consider the creation of satellite locations to meet the needs of the growing communities. Potential future library facilities could include a E-Library Center, which would provide the public with increased access to technology for the purpose of enhancing job skill sets and developing technology literacy.
LIB – Branch Community Rooms There are currently 19 community rooms in the branch library system available for public use. The Library will begin to explore the addition of community rooms at other branch locations based on the community's need and the availability of space.
CCSF – Facilities Master Plan City College is in the process of developing a new Facilities Master Plan to guide facilities development in the coming ten-year period. This Plan is anticipated to be adopted by the College’s governing Board in Spring 2017. Following adoption of the Plan, City College will act as the lead agency for environmental review compliance in conformance with California Environmental Quality Act (CEQA) requirements. Emerging needs identified will be included in future updates of the Capital Plan.

2022 - Recreation, Culture + Education: Deferred Projects

12. Recreation, Culture + Education

Deferred Projects

Project Name Description
REC – Recreation & Parks Roads  REC is responsible for all roadways within Golden Gate Park, Lincoln Park, McLaren Park and Balboa Park, and does not have a dedicated funding source to maintain them. REC continues to look for projects with funding opportunities that can improve the roadway infrastructure and enhance parks accessibility, such as the Mansell Streetscape Improvement Project in collaboration with SFMTA within McLaren Park.
The estimated roadways backlog is approximately $77.5 million, of which nearly $70 million  is within Golden Gate Park.
ARTS – African American Art & Culture
Complex Retrofit & Renovation
A facility assessment for the African American Arts and Culture Complex (AAACC) was completed in January 2020. AAACC received an SHR rating of 4. A renovation plan to improve the building to an SHR rating of 3 includes a structural retrofit; roof replacement and insulation; repairing exterior walls; replacement of all skylights, exterior doors, windows, louvers, interior doors; ADA barrier removal; a new fire alarm system; code required HVAC; new electrical switchgear, and new EV charging stations.
The cost estimate for this project is $15 million.
ARTS – SOMArts Cultural Center Retrofit & Renovation A facility assessment for the SOMArts Cultural Center (SOMArts) was completed in March 2019. SOMArts received an SHR rating of 4. A repair plan to bring the building to an SHR rating of 3 includes structural retrofit; partial exterior cladding replacement; limited replacement of exterior doors, windows, plumbing fixtures, lighting; replacement of HVAC system; minor roof and gutter repairs; new fire water connection and new double detector check valve; additional electrical outlets per code to address safety issues; and partial sitework replacement (paving, landscaping and fencing).
The cost estimate for this project is $15.5 million.
LIB – Main Library Seismic Moat and Joint Initial exploration and design work were accomplished on the seismic moat, working with Public Works architects and engineers.  In the meantime, the moat covers have remained stable enough that minor repairs are maintaining the covers safely for the time being.  It is believed safe to defer this project temporarily due to the fiscal challenges presented by COVID-19.
CCSF – Districtwide Projects CCSF has identified several projects that have been deferred due to lack of funding: the renovation and seismic upgrade of Cloud Hall at Ocean Campus, renovation of the Science Building and the Performing Arts Education Center at Ocean Campus, construction of a Performing Arts Education Center, modernization of the Downtown Center and the Evans Center, and an addition to the John Adams Center.
The total budget for CCSF’s deferred projects is $450 million. The College will continue to pursue State funding for deferred projects.
CCSF - Cloud Hall Academic Building Renovation This project will upgrade the building and address seismic safety needs. Elevators will be added to improve accessibility, and both indoor and outdoor student gathering/study spaces will be added at ground level.
SFUSD – Deferrals The unfavorable bidding climate has resulted in the deferral of 17 school site renovation projects, estimated at $508 million, originally slated for completion prior to the next SFUSD G.O. Bond in 2022.

New Recreation, Culture + Education: Deferred Projects

Deferred Projects

Project Name 

Description 

REC – Recreation & Parks Roads

REC has no dedicated funding capacity to maintain roadways and tries to collaborate with other departments to identify funding opportunities that can go towards this need. For example, REC worked with the SFMTA on the Mansell Corridor within McLaren Park.

The estimated roadways backlog is approximately $19 million.

ARTS – Cultural Centers Facility Master Plan

Several building deficiencies and possible seismic issues remain to be addressed at the City’s Cultural Centers. The severity of these facility needs, the cost of renovating the existing sites, and the possibility of relocating to other sites requires additional review and analysis. The Arts Commission partnered with Public Works to begin a facility condition assessment at SoMArts. Additional funding is needed to complete condition assessments on the African-American Art & Culture Complex, Mission Cultural Center for Latino Arts, and Bayview Opera House.

This assessment is estimated to cost $425,000, and may be funded via the Prop E set-aside.

REC – Coastal Trail Project CCSF – Districtwide Projects

CCSF has identified several projects that have been deferred due to lack of funding: the renovation and seismic upgrade of Cloud Hall at Ocean Campus, renovation of the Science Building and the Performing Arts Education Center at Ocean Campus, construction of a Performing Arts Education Center, modernization of the Downtown Center and the Evans Center, and an addition to the John Adams Center.

The total budget for CCSF’s deferred projects is $450 million. The College will continue to pursue State funding for deferred projects.

SFUSD – Deferrals

The unfavorable bidding climate has resulted in the deferral of 10 school site renovation projects originally slated for completion prior to the next SFUSD G. O. Bond in 2022.

 

McLaren Lodge
McLaren Lodge

Recreation, Culture + Education: Deferred Projects

Deferred Projects

Project Name 

Description 

REC – Recreation and Park Roads 

REC has no funding capacity to maintain roadways and tries to collaborate with other departments to identify funding opportunities that can go towards this need. For example, REC is working with the SFMTA on the Mansell Corridor within McLaren Park. 

 

The estimated roadways backlog is approximately $19 million. 

ARTS – Cultural Centers Facility Master Plan 

Though the ADA Transition plan funded accessibility improvements at the City’s cultural centers, building deficiencies and seismic issues remain. The severity of these facility needs, the cost of renovating the existing sites, and the possibility of relocating to other sites requires additional review and analysis. 

 

This assessment is estimated to cost $500,000. 

CCSF – Districtwide Projects 

CCSF has identified several projects that have been deferred due to lack of funding: the Seismic Upgrade of Cloud Hall at Ocean Campus; Renovation of the Science Building and the Theater/Arts Building at Ocean Campus; Construction of a Performing Arts Education Center; Modernization of the Downtown Center and the Evans Center; and an Addition to the John Adams Center. 

 

The total budget for CCSF’s deferred projects is $450 million. 

SFUSD – Ruth Asawa School of the Arts at 135 Van Ness 

The Ruth Asawa School of the Arts project at the historic 135 Van Ness Avenue location is currently deferred due to lack of funds. 

 

Of the $295 million 2003 SFUSD G.O. Bond, $15 million has been reserved for this project, but further fundraising is needed. 

2022 - Recreation, Culture + Education: Enhancement Projects

12. Recreation, Culture + Education

Enhancement Projects

Project Name Description
REC – Neighborhood Park Projects
& Open Space Improvements
Neighborhood parks typically include a mix of facilities and amenities, such as playgrounds, courts, fields, clubhouses, restrooms, and dog play areas. This program focuses on improving and modernizing facilities to provide recreational opportunities that meet current and future demand. New investment is needed to modernize the system, increase open space and recreational opportunities, improve the quality of park experience, and address currently unmet as well as future needs in high growth areas. These projects often have partnership investment, which are developed along with the projects, particularly for projects delivered from the Community Opportunity Fund.
This program will receive $25 million from the 2020 Health and Recovery G.O. Bond. Additional funding is expected from the REC set-aside within the General Fund and the planned 2028 G.O. Bond, pending voter approval. 
REC – ADA Improvements
to Parks Facilities
In coordination with the Mayor’s Office on Disability (MOD), this program includes disability access improvements to specific sites and facilities as cited for ADA complaints and barrier removals. Corrections include toilet and shower alterations, walkway and pathway paving to compliant accessible slopes, ramp and stair handrails and provision of accessible parking. In addition, REC is leveraging grants and other capital funds where possible.
The planned funding for this program is $600,000 per year from the REC set-aside within the General Fund. MOD continues to receive complaints related to physical access within this portfolio, and may make additional requests from the General Fund.
REC – Buchanan Street Mall Improvements  Buchanan Street Mall is comprised of five consecutive blocks of green space, asphalt paths, and underperforming playgrounds from Eddy Street to Grove Street. Presently within the five blocks are several temporary gardens, tree planters, seating areas, decorative lighting, and interactive sculptural multimedia installations that explain the neighborhood’s history. Developed through a robust community process, the project is intended to reinvigorate a long-underfunded community by creating a place that serves as a primary gathering place for the neighborhood, starting with the block between Golden Gate Avenue and Turk Street. Key design elements on the initial block renovation include playground and exercise equipment for all-age play, flexible spaces, landscaped area, and intimate gathering areas with seating options. Remaining funding could support a memory walk with a variety of interpretive elements.
This project will receive $2 million from the 2020 Health and Recovery G.O. Bond. In addition, $3 million is expected from the Market Octavia Plan Area in FY2022. Previously appropriated funding sources include $515,000 from the IPIC Market Octavia Plan Area and $578,000 from the General Fund. REC is also seeking to supplement this funding with Prop 68 grant funding in partnership with the Trust for Public Land.
REC – Buena Vista Park Buena Vista Park is a 36-acre park and includes a children’s play area, dog play area, tennis courts, restroom facilities, park maintenance facilities, trails, pathways, and landscaped and natural areas. The park contains one of the City’s few remaining coast live oak groves on its northern side. Improvements may include the restoration and repair of existing park elements such as circulation and hardscape improvements; soil management and erosion controls; forestry and planting improvements; water conservation and irrigation improvements; and enhancement of site furnishings and lighting.
This program will receive $3 million from the 2020 Health and Recovery G.O. Bond.
REC – Chinatown/Portsmouth
Square Improvements
This program would fund much-needed improvements to Portsmouth Square to create a central community space that is safe and welcoming to all, including the many residents of nearby affordable housing. REC has a preferred plan at Portsmouth Square that is currently undergoing environmental review. Improvements may include a reconstruction of amenities such as the playground or addition of other amenities; pathway and accessibility improvements; landscaping and beautification; removal of the pedestrian bridge over Kearny Street; expanded clubhouse footprint; and lighting improvements.
This project is estimated to cost $65 million, and will receive $54 million from the 2020 Health and Recovery G.O. Bond. The project has previously received $9 million in Transit Center Community Facilities District funding and plans to use $500,000 of Downtown Park Fund fee revenue.
REC – Citywide Parks Together, San Francisco’s citywide serving parks – Golden Gate Park, John McLaren Park, and Lake Merced Park – comprise almost 2,000 acres of open space, each with vast, ongoing capital needs. This program renovates and improves park features, including restoration of natural features, recreational assets, and connectivity and access at these citywide parks.
This program will receive $13 million from the 2020 Health and Recovery G.O. Bond.
REC – Crocker Amazon Playground Crocker Amazon Playground is a host to numerous fields, tennis and basketball courts, three concrete bleachers structures and a clubhouse. It is a regional hub for ground sports athletics, soccer, lacrosse, baseball, and softball, and an important facility for neighbors. REC is exploring a potential public-private partnership with the San Francisco Giants to support equitable access through a variety of youth enrichment programs, such as baseball, softball, academic support, etc. Identified opportunities could include renovation of the baseball diamonds, ancillary structures, and other amenities including educational facilities, restroom improvements, security, pathways, parking improvements, site amenities, and potential development of multi-use natural grass areas.
This project will receive $15 million from the 2020 Health and Recovery G.O. Bond. An additional $15 million is expected from a San Francisco Giants grant.
REC – Gene Friend Recreation Center Located in an area where open space and recreation opportunities are limited, this facility is heavily used by children, seniors, and others who live and work in the SoMa neighborhood – which is also one of the city’s fastest growing neighborhoods. REC collaborated with the Trust for Public Land on a feasibility study and concept plan, which replaces the existing facility with one almost twice the size. The new facility would include a double basketball court gym and a second story of program space with triple the number of multipurpose rooms. The project includes improved lighting, security, and new outdoor amenities: a basketball court, plaza space, playground, and landscaping.
This project will receive $30 million from the 2020 Health and Recovery G.O. Bond. Previous funding includes $27.8 million from Eastern Neighborhood and Central SoMa impact fees.
REC – Golden Gate Park
Botanical Garden Nursery
In collaboration with the San Francisco Botanical Garden Society, a new nursery will be built at the Golden Gate Park Botanical Garden. The proposed project will replace several of the Botanical Garden’s existing aging structures, related equipment and storage as well as infrastructure required for growing plants. In addition, the project will consolidate the Botanical Garden’s existing growing grounds and greenhouse facilities into a single, contiguous area at the site of its current nursery.
REC has budgeted $150,000 of General Fund in FY2022 to supplement the previously allocated $181,000 in FY2021. SFBGS is leading a $6.8 million fundraising campaign for the project, which has so far reached 85% of their stated goal.
REC – Herz Playground
New Recreation Center
Herz Playground, situated on the southeast corner of John McLaren Park, serves the Visitacion Valley neighborhood. The Herz project includes the construction of a new rec center on park property. The new facility will be approximately 11,500 square feet and feature an indoor basketball court, bleachers, office space, a multi-purpose room, restrooms, and other spaces for storage and building systems equipment. Outdoor improvements will include a plaza at the entrance, installation of adult fitness equipment, lighting, removal of hazardous trees, and pathway and circulation improvements to connect the park with the Sunnydale community and neighboring Community Center that will be developed as part of the HOPE SF Sunnydale redevelopment.
This project will receive $10 million from the 2020 Health and Recovery G.O. Bond. In collaboration with HOPE SF, REC is also developing a partnership agreement estimated at $10 million that consists of both funding and services.
REC – India Basin / 900 Innes Located in the Bayview-Hunters Point neighborhood, the 900 Innes property, acquired in 2014, is a brownfield that needs substantial remediation before development. By connecting the site to adjacent India Basin Shoreline Park, REC will be able to create one grand waterfront park, close a critical gap in the San Francisco Bay Trail, and increase access to open space in an under-served area of the city. Along with planned improvements to India Basin Open Space funded by the adjacent housing development, a 20-acre network of new and/or improved open space will be created. With an emphasis on access, social equity, waterfront recreation, sea level rise resiliency, and marsh and wetland habitat, this project will feature pedestrian and bicycle shoreline access, passive open space, fishing areas, tidal marshes, plazas and event spaces, picnic areas, site furnishings, and historical and educational displays.
The India Basin / 900 Innes project is projected to cost $128 million, of which $76.3 million has been identified.  This project will receive $29 million from the 2020 Health and Recovery G.O. Bond, $25 million from the John Pritzker Family Fund, and the remaining from combination of local, state and federal sources. REC is planning a private fundraising campaign, along with pursuing public grants, to bridge the remaining funding gap.
REC – Jackson Playground The 4.9-acre Jackson Playground is located in Potrero Hill and occupies an entire city block. Jackson Playground includes picnic areas, tennis and basketball courts, two ball fields, a children’s play area and clubhouse. REC, in collaboration with the Friends of Jackson Park community group, is working on a design for the renovation of the park. REC has a preferred plan at Jackson Playground that is currently undergoing environmental review. Improvements may include reorientation and renovation of some existing park amenities such as the sports fields, construction of a new playground, and the relocation, renovation and possible extension of the historic clubhouse.
This project will receive $10 million from the 2020 Health and Recovery G.O. Bond. In addition, the project is expected to receive $6.36 in FY2024 and 2025 from Eastern Neighborhood IPIC funding. The project has also previously been appropriated $1.6 million of Eastern Neighborhoods IPIC funding. This project is a partnership with Friends of Jackson who are expecting to raise approximately $9 million.
REC – Japantown Peace
Plaza Improvements
Japantown Peace Plaza, located in the heart of Japantown, was last renovated in 2000. For many years, the plaza has been leaking water to a public garage situated below the mall and plaza. The Japantown project will resolve the water intrusion and provide a reinvigorated space for the community. The renovation will include new planting, shade structures, paving, seating, lighting, and potential structural reinforcement of the Plaza and Peace Pagoda, if deemed necessary. The new community-driven, culturally sensitive design will provide more functional access to the Plaza, both for everyday and special event use, while harnessing the symbolism that this site holds within the neighborhood, city, and region.
This project will receive $25 million from the 2020 Health and Recovery G.O. Bond.
REC – Golden Gate Park Golden Gate Park Improvements would be delivered near the Golden Gate Park Senior Center to provide outdoor elements for senior or intergenerational engagement. These improvements could include outdoor, intergenerational exercise equipment to provide opportunities for both independent and guided activities, landscaping, communal gardening beds, pathways, and benches.
This project will receive $1 million from the 2020 Health and Recovery G.O. Bond.
REC – South Ocean Beach
and Sustainability Efforts
As part of the City’s first Climate Adaptation Project at South Ocean Beach, this initiative will create a new multi-use trail between Sloat Avenue and Skyline Boulevard with a restroom and a parking lot near Skyline, connecting the Lake Merced Trail and the Lower Great Highway Trail. The trail, restroom and parking lot project will be implemented in conjunction with other improvements at South Ocean Beach such as the creation of dune habitats, improved pathways to the beach, and the SFMTA, Caltrans and PUC-led projects in the area.  Other anticipated projects include conservation, protection and restoration efforts, such as forest management; water conservation measures; energy generation and conservation measures; landscaping with native plants; acquisition, improvement, or expansion of urban agriculture sites; and development of new spaces to improve resiliency.
These projects will receive $14 million from the 2020 Health and Recovery G.O. Bond. Previously, the trail project has received $1.7 million in funding from the Federal FLAP program, $264,000 from Prop K sales tax, and $45,000 from an in-kind donation from SPUR.
REC - South Sunset Playground South Sunset Playground is a 4-acre park featuring ball fields, basketball and tennis courts, a playground, a paved multi-use play area and the clubhouse. The 2,600 square-foot single-story clubhouse includes a multi-purpose room, restrooms, a kitchen, and an office. The building was originally constructed in 1957 and has not seen any major renovation in decades. Improvements to the park could include the reconfiguration or renovation of interior spaces or building systems in the clubhouse, access improvements, landscaping, and beautification.
This project will receive $3 million from the 2020 Health and Recovery G.O. Bond.
REC – Kezar Pavilion Seismic Upgrade With a seating capacity of more than 5,000, the historic Kezar Pavilion, situated in the southeastern corner of Golden Gate Park, is used for large sporting events, and could be used for functions such as shelter, mass care and mutual aid after a major disaster. In 2013, an engineering study by Public Works found that Kezar Pavilion needs a seismic upgrade to ensure safety for staff and public use. The facility also requires comprehensive systems upgrades and historic rehabilitation.
The cost estimate for this project is $88 million. It will receive $70 million from the 2020 ESER G.O. Bond, and $5 million from the 2020 Health and Recovery G.O. Bond. Additional funding sources are yet to be identified.  
REC - Esprit Park The Esprit Park renovation is a partnership project between REC, UCSF and the Dogpatch and Northwest Potrero Hill Green Benefit District. Renovation of this roughly 2-acre park includes drainage and irrigation improvements, refined circulation throughout the park, retaining the urban forest feel, clarifying functional use areas and providing infrastructure and amenities for different user groups including children, adult fitness community, and off-leash dog walkers.
The project has received $5 million from UCSF, $2.7 million through IPIC Funding and a $35,000 General Fund contribution.
REC – New Park Acquisitions
and Capital Development Needs
REC is currently reviewing potential site acquisitions for future parks in San Francisco. The recently acquired site at 11th Street in western SoMa needs to be remediated, planned, designed and developed. Planning for the new park is expected to begin in early 2021.
The 11th & Natoma project has received $8.8 million in Impact Fees from Eastern Neighborhoods and is expected to receive $3 million from Market Octavia Impact Fees. This project has also received $9.7 million for acquisition and $275,000 for remediation needs from REC’s Open Space Acquisition Fund.
REC – Bond Planning and Implementation This program funds staff time to progress and complete neighborhood park projects and citywide programs associated with the 2020 Health and Recovery G.O. Bond and future G.O. Bonds.
The projected funding for this program is $9.2 million over five years coming from the Central SOMA Interagency Plan Area.  
LIB – Resilience Improvements The Library’s upcoming strategic planning efforts will address climate change issues in accordance with the City’s strategic plans and desired goals for weather relief centers. Working together with City partners such as the Office of Resilience and Capital Planning, Department of Emergency Management, and Department of Public Health, it is likely that some Library locations will be identified for the installation of enhanced cooling and/or air filtering systems to provide shelter for citizens during smoke or heat days. This work builds on the Library’s ongoing efforts to install more green energy systems, such as the solar energy project currently underway in partnership with the PUC at the 190 9th Street Support Facility.
In FY22 the Library has appropriated $291,000 for implementation of small-scale resilience projects.
LIB – Chinatown Branch Renovation The Chinatown Branch Library renovation will address the needs of the community and include the latest innovations in delivery of library collections, programs, and learning. The Chinatown Branch has special historical architectural significance, and the restoration of previously lost historical features will also be explored.
The estimated cost of the Chinatown Renovation is $29.5 million, including a budget for relocation of library service during construction. Given the challenges presented by the COVID-19 pandemic, the Library has appropriated $9.5 million towards this project through FY21, $1 million in FY22, and $2.5 million in FY23, leaving a budget gap of $16.5 million. With the Library Preservation Fund up for renewal in 2022, no additional Library funds are committed at this time.
LIB – Ocean View Branch New Construction Originally planned as a renovation, work for the Ocean View Branch Library has been re-envisioned as a new large facility to serve a beacon for the OMI neighborhood and beyond. Planning work has begun, engaging the community during the last two years to discuss project scope and identifying a probable site. There has been discussion about dovetailing the Library project with traffic improvements in the area long been desired by SFMTA, which may impact the timeline.
The estimated cost for the Ocean View construction project is $47 million. The Library has appropriated $12.5 million for this project through FY21, $1 million in FY22, and $2.5 million in FY23, leaving a budget gap of $31 million. With the Library Preservation Fund up for renewal in 2022, no additional Library funds are committed at this time.
CCSF – Ocean Campus Utility
Infrastructure Replacement 
Infrastructure replacement and capital improvements at the Ocean Campus will address systems at risk of catastrophic failure and correct deficiencies that represent significant hazards to students, faculty, staff and the public. The scope of the project will repair, modify, replace, and/or construct the following infrastructure systems: fire suppression systems, potable water, sanitary sewer, storm drainage, natural gas and electrical distribution, data and emergency notification, video surveillance, lighting, boilers, and steam distribution.
The budget for this effort is $73.9 million and will be funded out of the California Chancellor’s Office Capital Outlay Program.
CCSF – 750 Eddy Street Seismic
and Code Upgrades
This project will add structural integrity to the building by bringing it into conformance with current building code. Concurrently, upgrades will be made to mechanical, plumbing, electrical, communication, building envelope, interior walls, floors, and ceilings as required by code and to facilitate seismic enhancements.
The revised budget for this project is $25.5 million, and CCSF is requesting additional funding from the California Chancellor’s Office Capital Outlay Program.
CCSF – Evans Center Renovation Structural and seismic and earthquake safety upgrades, including roof and window repairs to address water leaks, and reconfigure and upgrade skill-building spaces.
The budget for this project is $24.6 million through FY2031
CCSF - Diego Rivera Theater with Mural This project would construct a new performing arts theater. The black box theater will make possible credentialed programs not currently available. The theater will be the future home of the Diego Rivera Pan American Unity mural.
The budget for this project is $95.7 million through FY2031
CCSF - STEAM Center This project will build a multi-story facility to anchor programs for the Science Technology Engineering Arts and Math (STEAM) disciplines demanded by students. Also, new class spaces and offerings will help students gain hands-on learning experiences needed to secure good-paying jobs.
The budget for this project is $151 million though FY2031
CCSF - Student Success Center This project will consolidate over 30 student development programs such as academic counseling, tutoring, career center, and transfer center. Improved access to services is key to increasing and maintaining future enrollment. The entire student body will be better served, especially historically marginalized student populations.
The budget for this project is $126 million through FY2031
CCSF – Science, Arts and
Media Building Renovations
City College will address high priority structural upgrades and facility renovations at the Science Hall Academic building, and the Creative Arts and Multi Media building.
The budget for these projects is $132.3 million though FY2031
CCSF - New Child Care Center This project will replace the current onsite childcare center, currently located in a temporary portable structure, with a facility that better serves faculty, staff and student families.
The budget for this project is $11.5 million through FY2031.
SFUSD – Various Modernization, Expansion,
and Seismic Improvement Projects 
SFUSD has several long-standing seismic deficiencies and deferred maintenance needs. In addition, current demographic projections anticipate that SFUSD enrollment will grow by between 7,400 and 16,000 new students over the next 10 years, and this growth will require the expansion of current schools, as well as the possible construction of new schools. Also, SFUSD plans to continue making improvements for greater building efficiency, sustainability, and education-minded design.
This wide range of projects will be funded primarily by the $744 million 2016 SFUSD G.O. Bond and a planned $1 billion G.O. Bond in FY2022. Other funding sources may include state grants, impact fees, and other local sources.

New Recreation, Culture + Education: Enhancement Projects

Enhancement Projects

Project Name Description
REC – ADA Improvements to Parks Facilities

This program includes disability access improvements to specific sites and facilities as cited for ADA complaints and barrier removals. Specific types of corrections include toilet and shower alterations, walkway and pathway paving to compliant accessible slopes, ramp and stair handrails and provision of accessible parking.

The planned funding for this program is $600,000 per year from the REC set-aside within the General Fund.

REC – Citywide Programs

This program addresses a broad range of citywide needs related to the Recreation and Parks system, including trails and open space, playgrounds, forestry needs, water conservation, and the continuation of the successful Community Opportunity Fund Program, which allows residents and advocates to initiate improvements in their parks.

This program will receive funding from the proposed 2020 Parks and Open Space G.O. Bond, pending voter approval.

REC – Crocker Amazon

Crocker Amazon,  known both as a playground and a park,  is a  host to numerous fields, tennis courts, three concrete bleachers structures and a recreation center. It is a regional hub for ground sports athletics, soccer, lacrosse, baseball, and softball. This is also an important facility for neighbors. The proposed improvements will include renovation of the baseball fields and related amenities and youth classroom space for an enrichment program.

This program will receive funding from the proposed 2020 Parks and Open Space G.O. Bond, pending voter approval.

REC – Gene Friend Recreation Center Improvements

Located in an area where open space and recreation opportunities are limited, this facility is heavily used by children, seniors, and people who live and work in the SoMa neighborhood – which also happens to be one of the city’s fastest growing neighborhoods. REC collaborated with the Trust for Public Land on a feasibility study and concept plan, which replaces the existing facility with one that is 50% larger with an emphasis on increased visibility and security. The new facility would include two indoor basketball courts, three multi-purpose rooms, a larger exercise room, a new kitchen, a new playground, an outdoor basketball court, as well as new landscaping and other recreation amenities.

This project is expected to receive $25 million from Central SoMa impact fees and is a candidate for the proposed 2020 Parks and Open Space G.O. Bond, pending voter approval.

REC – Herz Playground Improvements

The improvements at Herz Playground would build upon the renovations made as part of initiatives such as Let’s Play SF!, the nearby community garden, the new rain garden at Leland Avenue, as well as the new safe crossing at Visitacion Middle School.

This project is a candidate for the proposed 2020 Parks and Open Space G.O. Bond, pending voter approval.

REC – India Basin / 900 Innes

Located in the Bayview-Hunters Point neighborhood of San Francisco, the 900 Innes property was acquired in 2014 for $3 million and is a brownfield that needs substantial remediation before park development. With an emphasis on access, social equity, waterfront recreation, sea level rise resiliency, and marsh and wetland habitat, the India Basin Project will give the community eight acres of waterfront open space. This project presents a unique opportunity to create a multitude of connections, such as uniting the historic boatyard of 900 Innes and the underutilized India Basin Shoreline Park into one park; completing 1.5 miles of accessible shoreline along the San Francisco Bay, linking to the Bay Trail and the Blue Greenway; and fostering better accessibility from the neighborhood.

The first phase, remediation, is expected to cost $11.5 million, funded by $9 million in grants, $1.25 million from the General Fund, and $600,000 from the Open Space Fund. REC is working to secure additional grant funding to close the funding gap for the remediation phase and move the full vision into design. This project is a candidate for partial funding from the proposed 2020 Parks and Open Space G.O. Bond, pending voter approval. REC will also pursue philanthropic resources and public grants to complete the project.

REC – Japantown Peace Plaza Surface Improvements

This project would replace the crumbling plaza surface at Japantown Peace Plaza and mitigate water intrusion from the subsurface garage. This critical public space supports local merchants, festivals with international appeal, and is a significant cultural resource. By working with key community groups, REC will develop a design that is contextually sensitive and culturally appropriate. The new design will create flexible open space for activities, eating, design-friendly elements suited to cultural performances, movie nights, and annual festivals.

This project is a candidate for the proposed 2020 Parks and Open Space G.O. Bond, pending voter approval. The City will also explore modified parking revenue as a source to support the project’s feasibility.

REC – Kezar Pavilion Seismic Upgrade

With a seating capacity of more than 5,000, Kezar Pavilion is a historic facility used for large sports events. Its aging infrastructure, high use demands, and seismic condition led to the need for a feasibility analysis. In 2013, an engineering study by Public Works found that Kezar Pavilion needs a seismic upgrade to ensure safety for staff and public use.

This project is in the conceptual planning phase and is a candidate for the Earthquake Safety Priority Facilities Program within the proposed 2020 ESER G.O. Bond, pending voter approval.

REC – Neighborhood Parks and Open Space Improvements

Neighborhood parks typically include a mix of facilities and amenities, such as playgrounds, courts, fields, clubhouses, restrooms, dog play areas, and so on. This program focuses on improving and modernizing facilities to provide recreational opportunities that meet current and future demand. New investment is needed to modernize the system, increase open space and recreational opportunities, improve the quality of the parks experience, and address currently unmet as well as future needs in high growth areas.

This program will receive funding from the proposed 2020 Parks and Open Space G.O. Bond, pending voter approval.

REC – Portsmouth Square Improvements

This project would make much-needed improvements to Portsmouth Square to create a central community space that is safe and welcoming to all, including the many residents of nearby affordable housing. The scope of this project includes a seismic upgrade of the parking garage, a larger open upper terrace, more shade throughout, a large new clubhouse that opens onto the park, a consolidated playground and exercise area, greater visibility across the park, improved lighting, and a perimeter fence to lock the park at night.

This project is estimated to cost $65 million and is a candidate to receive funding from the proposed 2020 Parks and Open Space G.O. Bond, pending voter approval.

REC – Regional Park Improvements

This program renovates and improves park features, including restoration of natural features, recreational assets, and connectivity and access at Golden Gate Park, McLaren Park, and Lake Merced, and facilities such as the Golden Gate Park Senior Center.

This program will receive funding from the proposed 2020 Parks and Open Space G.O. Bond, pending voter approval.

LIB – Main Library Lighting Project

This project will install new lighting system and refurbish existing light fixtures on the Main Library exterior to improve lighting for the public and address safety concerns.

The estimated cost for this project is $2 million, to be funded by the Library Preservation Fund in FY2020.

LIB – Ocean View Branch Library

The Ocean View Branch Library is the second branch renovation project in the upcoming program, after the Mission branch. Work has already begun, engaging the community to discuss project scope, with additional community meetings planned for January 2019.

The estimated cost for this project is $8.4 million, and will be funded by the Library Preservation Fund in FY2020.

LIB – Chinatown Branch Library

The Chinatown Branch Library is the final branch renovation project of the upcoming program. This renovation will address the needs of the community and include the latest innovations in delivery of library collections, programs, and learning. The Chinatown Branch has special historical architectural significance, and the restoration of previously lost historical features will also be explored.

The estimated cost for this project is $29.4 million, to be funded by the Library Preservation Fund starting in FY2020.

LIB – Compact Shelving at 750 Brannan Street

The Library will complete the installation of compact shelving at its leased archival storage facility located at 750 Brannan Street by FY2020. Installation of the last bank of compact shelving will allow the Library to fully vacate the Brooks Hall space it currently uses to store collections and archival materials.

The remaining portion of this project is estimated to cost $1.8 million, to be funded by the Library Preservation Fund in FY2020.

CCSF – Ocean Campus Utility Infrastructure Replacement

Infrastructure replacement and capital improvements at the Ocean Campus will address systems at risk of catastrophic failure and correct deficiencies that represent significant hazards to students, faculty, staff and the public. The scope of the project will repair, modify, replace, and/or construct the following infrastructure systems: fire suppression systems, potable water, sanitary sewer, storm drainage, natural gas and electrical distribution, data and emergency notification, video surveillance, lighting, boilers, and steam distribution.

The budget for this effort is $62.2 million and will be funded out of the California Chancellor’s Office Capital Outlay Program.

CCSF – 750 Eddy Street Seismic and Code Upgrades

This project will add structural integrity to the building by bringing it into conformance with current building code. Concurrently, upgrades will be made to mechanical, plumbing, electrical, communication, building envelope, interior walls, floors, and ceilings as required by code and to facilitate seismic enhancements. Permitting through the Division of the State Architect is anticipated to occur in the first half of FY2020. Construction procurement is anticipated in the second half of FY2020, and construction is anticipated to take 18 months.

The revised budget for this project is $17.6 million, and CCSF is requesting additional funding from the California Chancellor’s Office Capital Outlay Program.

CCSF – Classroom Technology Enhancements

This project will continue ongoing efforts to provide state-of-the-art instructional technology in classrooms across CCSF.

The budget for this project is $1.7 million, funded out of the California Chancellor’s Office Physical Plant and Instruction Support Program, as well as an Adult Education Block Grant.

CCSF – Downtown Center Fifth Floor Renovation

This project will provide needed additional classrooms on the fifth floor of the Downtown Center.

The budget for this project is $1 million dollars, funded out of the California Chancellor’s Office Physical Plant and Instructional Support Program.

CCSF – Wayfinding and Compliance and Signage Upgrades (All Locations)

This project will provide upgraded signage at all CCSF locations as needed for enhanced wayfinding. It also includes enhanced signage related to parking, traffic, and smoking compliance.

The project budget is $100,000, funded out of the California Chancellor’s Office Physical Plant and Instructional Support Program.

SFUSD – Various Modernization, Expansion, and Seismic Improvement Projects

The SFUSD has several long-standing seismic deficiencies and deferred maintenance needs. In addition, current demographic projections anticipate that SFUSD enrollment will grow by between 6,000 and 12,000 new students over the next 15 years, and this growth will require the expansion of current schools, as well as the possible construction of new schools. Also, the SFUSD plans to continue making improvements for greater building efficiency, sustainability, and education-minded design.

This wide range of projects will be funded primarily by the recently-approved $744 million 2016 SFUSD G.O. Bond, and a planned $1 billion G.O. Bond in FY2022. Other funding sources may include state grants, impact fees, and other local sources.

Sports Fields
Sports Fields

Recreation, Culture + Education: Enhancement Projects

Enhancement Projects

Project Name Description
REC – ADA Improvements to Parks Facilities

This program includes disabled access improvements to specific sites and facilities as cited for ADA complaints and barrier removals. Specific types of corrections include toilet and shower alterations, walkway and pathway paving to compliant accessible slopes, ramp and stair handrails and provision of accessible parking.

 

The planned funding for this program is $600,000 per year from the REC set-aside within the General Fund.

REC – Bond-Funded Neighborhood Parks and Open Space Program

The Neighborhood Parks and Open Space G.O. Bond Program funds park system modernization, increases in open space, improvement of geographic equity, and other long-standing capital needs. Examples of priority needs include those at India Basin, Gene Friend Recreation Center, Kezar Pavilion, Mission Recreation Center, Crocker Amazon Clubhouse, and Portsmouth Square.

 

The next Neighborhood Parks and Open Space G.O. Bonds are planned for 2019 and 2025 elections, slated at a projected $185 million each, and at least $150 million from each of those bonds is expected to go toward this program. REC has a number of substantial obligations remaining in its capital portfolio. Addressing these needs will require a multi-bond investment at currently anticipated levels and would benefit from an extended planning horizon.

REC – Citywide Programs and Park Improvements

This program addresses a broad range of citywide needs related to the Recreation and Parks system, including redesigning 13 failing playgrounds, improving trails and open space at citywide parks, addressing forestry needs, water conservation, and the continuation of the successful Community Opportunity Fund Program, which allows residents and advocates to initiate improvements in their parks.

 

This program, including the six highest-priority playgrounds, is estimated to cost $33 million and it is funded by the 2012 Neighborhood Parks and Open Space G.O. Bond. REC is working with the SF Parks Alliance to raise funds for the remaining playgrounds.

REC – Angelo J. Rossi Pool Renovation Project

This project includes renovation of the pool, pool building, and maintenance storage facility, as well as improved park accessibility. Work will begin on this project once the renovation at Balboa Pool is complete.

 

The estimated cost for this project is $8.2 million, and it is funded by the 2012 Neighborhood Parks and Open Space G.O. Bond.

REC – Coastal Trail Project

As part of the South Ocean Beach Plan, the Coastal Trail Project is an initiative to create a new multi-use trail between Sloat Avenue and Skyline Boulevard. The project is being implemented in conjunction with the Great Highway narrowing project taking place in the same location. Project planning will take place throughout 2017.

 

The estimated cost for this project is $2 million, and it is funded by the Federal FLAP grant, Prop K, SPUR, and the General Fund.

REC – Garfield Pool Improvement Project

This project includes the renovation of the pool, pool building, reconfiguration of park indoor facilities, and improved park accessibility at Garfield Square. Work will begin on this project once the ongoing renovation at Balboa Pool is complete.

 

The estimated cost for this project is $11 million, and it is funded by the 2012 Neighborhood Parks and Open Space G.O. Bond and Impact Fees.

REC – George Christopher Playground Improvement

This project includes improvements to the children's play area, exterior clubhouse restrooms, and park access. Construction is projected to begin in 2017 with expected completion in 2018.

 

The estimated cost for this project is $2.8 million, and it is funded by the 2012 Neighborhood Parks and Open Space G.O. Bond.

REC – Margaret S. Hayward Playground Improvement Project

Margaret S. Hayward Park, covers an area of 265,000 square feet and is located at the corner of Turk and Gough Streets. This project includes renovation and consolidation of park structures including recreational buildings, storage and restrooms, improving park access and replacement of sport courts, playfields, play areas, and related amenities. The project entered the design phase in 2016 and is expected to open to the public in 2018.

 

The estimated cost for this project is $14 million, funded by the 2012 Neighborhood Parks and Open Space G.O. Bond and Impact Fees.

REC – Potrero Hill Recreation Center Improvement Project

Potrero Hill Recreation Center is a 455,000 square foot facility that includes playfields, tennis courts, a dog play area, playground and recreation center. This project includes replacement and renovation of natural turf playfields and the dog play area, as well as improvement of site lighting.

 

The estimated cost for this project is $4.2 million, and it is funded by the 2012 Neighborhood Parks and Open Space G.O. Bond and Impact Fees.

REC – Turk and Hyde Mini Park Improvement

This park, located at 201 Hyde Street and covering 6,500 square feet, has a children’s play area, landscaping, and related amenities. This project includes renovation of the children’s play area, landscaping and related amenities, as well as addressing site accessibility.

 

The estimated cost for this project is $1.7 million, and it is funded by the 2012 Neighborhood Parks and Open Space G.O. Bond and the General Fund.

ARTS – ADA Barrier Removal at Cultural Facilities

The project is part of the City and County of San Francisco's ADA UPhAS Transition Plan to meet the requirements of the Americans with Disabilities Act per 28 CFR Part 35 of Title II. Forthcoming work on the project includes ADA disability access improvements at the SOMArts Center (Phase 2 ADA Renewals), rounding out previous barrier removal work at the African-American Arts Cultural Center (Phase 2 ADA Renewals) and the Mission Cultural Arts Center (Phase 1 ADA Renewals).

 

The total project budget for cultural centers barrier removal is $1.5 million; $600,000 in General Fund was appropriated previously, and $900,000 is anticipated in FY2018.

LIB – Branch Improvements at Chinatown and Mission Branch Libraries

Chinatown and Mission branch libraries are the next branch libraries slated for renovation. Initial project funding will cover planning and pre-development costs, including a community engagement process. Branch renovations are anticipated to address community needs, expand teen space, revamp program rooms, actualize innovations in service delivery and collections management, and include ADA improvements, preservation or restoration of historic features, and energy efficiency work. The initial phase is expected to begin in FY2018, with construction expected in FY2020.

 

The total estimated cost for this project is $27 million, funded by the Library Preservation Fund.

LIB – Main Library Improvements

This project will optimize space usage at the Main Library based on changing business needs. This will include the implementation of additional materials sorting equipment on the lower level to improve efficiencies and reduce repetitive motion work associated with manual materials sorting.

 

The estimated project cost is $1.5 million, and it will be funded by the Library Preservation Fund over three years, starting in FY2019.

LIB – Support Services Facility Tenant Improvements

The Library's Support Services Facility at 190 Ninth Street was originally purchased in 2004, and included all furnishings. Tenant improvements are geared toward capturing underutilized space and creating more space for additional staffing capacity, staff training services and staff programming. Tenant improvements will also create energy efficiencies, improve library collections receipt and processing, expand storage capacity, and make ergonomic upgrades for staff.

 

The estimated project cost is $1.5 million, and it will be funded by the Library Preservation Fund over three years, starting in FY2021.

CCSF – 750 Eddy Street Seismic and Code Upgrades

This project will bring structural integrity into current building code conformance. Concurrently, upgrades will be made to mechanical, plumbing, electrical, communication, building envelope, interior walls, floors and ceilings as required by code and to facilitate seismic enhancements. Plans and specifications will be developed in FY2018; permitting through the Division of the State Architect is anticipated to occur in the first half of FY2019. Construction procurement is anticipated in the second half of FY2019. Construction is anticipated to take 18 months.

 

The budget for this project is $11 million and will be funded out of the California Chancellor’s Office Capital Outlay Program.

CCSF – Classroom Technology Enhancements

This project will continue ongoing efforts to provide state-of-the-art instructional technology in classrooms across the district.

 

The budget for this project is $1.7 million, funded out of the California Chancellor’s Office Physical Plant and Instruction Support Program, as well as an Adult Education Block Grant.

CCSF – Downtown Center Fifth Floor Renovation

This project will provide needed additional classrooms on the fifth floor of the Downtown Center.

 

The budget for this project is $1 million dollars, funded out of the California Chancellor’s Office Physical Plant and Instructional Support Program.

CCSF – Wayfinding and Compliance and Signage Upgrades (All Locations)

This project will provide upgraded signage at all District locations as needed for enhanced wayfinding. It also includes enhanced signage related to parking, traffic, and smoking compliance.

 

The project budget is $100,000, funded out of the California Chancellor’s Office Physical Plant and Instructional Support Program.

SFUSD – Various Modernization, Expansion, and Seismic Improvement Projects

The SFUSD has several long-standing seismic deficiencies and deferred maintenance needs. In addition, current demographic projections anticipate that SFUSD enrollment will grow by between 6,000 and 12,000 new students over the next 15 years, and this growth will require the expansion of current schools, and the possible construction of new schools as well. Also, the SFUSD plans to continue making improvements in building efficiency, green building technologies, and the use of renewable and sustainable resources, as well as providing a modern environment to accommodate the latest thinking education.

 

This wide range of projects will be funded primarily by the recently-approved $744 million 2016 SFUSD G.O. Bond, and a planned $513 million G.O. Bond in FY2022. Other funding sources may include state grants, impact fees, and other local sources.

2022 - Recreation, Culture + Education: Renewal Program

12. Recreation, Culture + Education

Renewal Program

The overall renewal needs for the City’s Recreation, Culture, and Education facilities total nearly $2 billion over the next 10 years. Given funding constraints, the Plan recommends nearly $372 million from the General Fund and other local sources to meet these needs, as shown in Chart 12.1.

Chart 12.1
Chart 12.1

Because the majority of renewal funds for Parks and Libraries are protected by voter-approved set-asides, there is relatively less COVID-19-related risk to their funding. The same is not true for the City’s Civic Art Collection, cultural centers, and museums.

Priority parks renewal needs include pathway improvements, court resurfacing, and playfield and playground repairs. The 2020 Health and Recovery Bond included a program to address priority deferred maintenance needs in the Recreation and Parks portfolio.

The Arts Commission has completed a needs assessment for the Civic Art Collection. Roofing and masonry projects at the Legion of Honor and the Opera House also represent significant needs. Mechanical and electrical components in the Steinhart Aquarium require replacement at the Academy of Sciences.

Not included in the renewal curve shown here are the needs for CCSF and SFUSD. CCSF has identified $900 million in planned capital projects over the next 10 years, which still leaves a deferred maintenance backlog of $1.7 billion. Planned CCSF renewal projects include utility infrastructure replacement, boiler and roof repairs, and district-wide asphalt, concrete, and painting projects. SFUSD has a five-year plan to estimate deferred maintenance needs. With less state funding available for deferred maintenance, such projects are being funded through G.O. bonds. Needs that must be addressed before bond proceeds become available include repairs to roofing, boilers, HVAC and electrical systems, fire alarms and suppression systems, plumbing, and aging modular building replacement.

 

New Recreation, Culture + Education: Renewal Program

Renewal Program

The overall renewal needs for the City’s Recreation, Culture, and Education facilities total $792 million over the next 10 years. Given funding constraints, the Plan allocates nearly $310 million from the General Fund to meet these needs, as shown in Chart 11.1.

Chart 11.1
Chart 11.1

Priority parks renewal needs include pathway improvements, court resurfacing, and playfield and playground repairs. It is expected that the proposed 2020 Parks and Open Space G.O. Bond will include a program to address priority deferred maintenance needs in the Recreation and Parks portfolio.

The Arts Commission recently completed a needs assessment for the Civic Art Collection. Roofing and masonry projects at the Legion of Honor and the Opera House also represent significant needs. Mechanical and electrical components in the Steinhart Aquarium require replacement at the Academy of Sciences.

Not included in the renewal curve shown here are the needs for CCSF and SFUSD. CCSF’s facilities data show a capital renewal need of $524 million and a deferred maintenance backlog of $18 million. Planned CCSF renewal projects include utility infrastructure replacement, boiler and roof repairs, and district-wide asphalt, concrete, and painting projects. SFUSD has a five-year plan to estimate deferred maintenance needs. With less state funding available for deferred maintenance, such projects are being funded through G.O. bonds. Needs that must be addressed before bond proceeds become available include repairs to roofing, boilers, HVAC and electrical systems, fire alarms and suppression systems, plumbing, and aging modular building replacement. Funding sources for SFUSD deferred maintenance are expected to remain limited for the duration of this Capital Plan.

 

Recreation, Culture + Education: Renewal Program

Renewal Program

The overall renewal needs for the City’s Recreation, Culture, and Education facilities total $696 million over the next 10 years. Given funding constraints, the Plan allocates $295 million from the General Fund to meet these needs, as shown in Chart 11.1.

Chart 11.1
Chart 11.1

Priority parks renewal needs in this service area include pathway improvements, court resurfacing, and playfield improvements. The Arts Commission recently completed a needs assessment showing significant renewal needs related to the Civic Art Collection.

Roofing and masonry projects at the Legion of Honor and the War Memorial Opera House also represent significant needs. Mechanical and electrical components in the Steinhart Aquarium require replacement at the California Academy of Sciences.

Not included in the renewal curve are the needs for CCSF and SFUSD. CCSF’s facilities data shows a current capital renewal need of $524 million and a deferred maintenance backlog of $18 million. Planned CCSF renewal projects include utility infrastructure replacement, boiler and roof repairs, and district-wide asphalt, concrete, and painting projects. SFUSD has a five-year plan to estimate deferred maintenance needs. With less state funding available for deferred maintenance, such projects are being funded through G.O. bonds. Needs that must be addressed before bond proceeds become available include repairs to roofing, boilers, HVAC and electrical systems, fire alarms and suppression systems, plumbing, and aging modular building replacement. Funding sources for SFUSD deferred maintenance are expected to remain limited for the duration of this Capital Plan.

Subscribe to