Renewal Program

The Plan proposes $1.6 billion in funding for Public Works renewal needs over the next 10 years, with $835 million coming from the General Fund, as shown in Chart 10.1. SFPUC renewal projects are not represented in this curve.

Chart 10.1

Chart 10.1

The General Fund streets and right-of-way renewal program includes street resurfacing, curb ramp inspection and repair, median maintenance, plaza inspection and repair, sidewalk inspection and repair, street structure repair, bridge inspection and repair, and street tree planting, establishment, and maintenance. The street resurfacing program is by far the largest of these, with a planned investment of $1 billion over the next 10 years.

The SFPUC’s renewal program includes sewer replacements, pump system rehabilitations, water storage upgrades, technology infrastructure improvements, and many other projects necessary to provide for San Francisco’s water, wastewater, and power needs. As noted above, SFPUC renewal projects are not included in the Service Area renewal curve as the General Fund does not fund the Enterprise Department's projects. For more information on SFPUC renewals, please see the narrative descriptions in the following pages. 

 

Project Name

Description

PW – Street Tree Maintenance and Sidewalk Repair

Public Works is responsible for maintaining approximately 125,000 street trees. Proposition E of the November 2016 ballot set aside annual funding towards this need and Public Works will have the resources to maintain street trees on an average three-to-five-year cycle, inspect all street trees annually, and make sidewalk repairs on a similar cycle.

 

The estimated cost for street tree maintenance and related sidewalk repair is $295.3 million over the next 10 years, of which $249.2 million is funded by the General Fund through Proposition E.

PW – Bridge Inspection and Repair

Public Works is responsible for the inspection and maintenance of three moveable bridges and 93 vehicle/pedestrian bridges throughout the City. Work performed under this program includes general inspection and maintenance to moveable, vehicular, and pedestrian bridges to maintain safety and proper operations, and to minimize long-term renewal costs. The Islais Creek Bridge Rehabilitation project will include bridge machine equipment and system repair and upgrades, bridge deck and fender system replacement, bridge painting, and other damage and corrosion repairs.

 

The estimated cost for the Islais Creek Bridge project is $102.6 million, with $11.8 million being funded by the General Fund, and $90.8 million from a Federal grant. The estimated cost for ongoing bridge inspection and repair is $5 million over the next 10 years. The Plan recommends $2.9 million from the General Fund towards this need. PW has also identified an additional $37.7 million in bridge rehabilitation needs.

SFPUC Hetch Hetchy – Water Infrastructure

The Water Infrastructure program provides capital funding for Renewal & Replacement (R&R) and Large Infrastructure projects on HHWP’s assets that are classified by the Water Supply Agreement (WSA) as Water. The proposed FY23/24 10-year Capital Plan includes $185.6M under the Water Infrastructure authority level which is used to fund capital improvements on the San Joaquin Pipelines, Mountain Tunnel, and other water assets.  

 

The cost of SFPUC’s Hetch Hetchy – Water Infrastructure renewal and replacement projects is approximately $185.6 million through FY2033. 

SFPUC Hetch Hetchy – Power Infrastructure

The Power Infrastructure program provides capital funding for Renewal & Replacement (R&R) and Large Infrastructure projects on HHWP’s assets that are classified by the Water Supply Agreement (WSA) as Power. The proposed FY23/24 10-year Capital Plan includes $223.3 under the Power Infrastructure authority level which is used to fund capital improvements on the power facilities such as Moccasin Switchyard, Kirkwood Powerhouse, Moccasin Powerhouse, Holm Powerhouse, 115kV and 230kV Transmission Lines, Warnerville Substation, Cherry-Eleanor Pumps, and other power assets. 

 

The cost of SFPUC’s Hetch Hetchy – Power Infrastructure renewal and replacement projects is approximately $223.3 million through FY2033. 

SFPUC Hetch Hetchy – Water and Power Joint Infrastructure

The Joint Infrastructure program provides capital funding for Renewal & Replacement (R&R) and Large Infrastructure projects on HHWP’s assets that are classified by the Water Supply Agreement (WSA) as Joint. The proposed FY23/24 10-year Capital Plan includes $568.1M under the Joint Infrastructure authority level which is used to fund capital improvements on the joint facilities such as O’Shaughnessy Dam, Canyon Tunnel, Mountain Tunnel, Moccasin Wastewater Treatment Plant, Power Distribution Lines, Cherry Dam, Buildings & Grounds, and other joint assets.

 

The cost of SFPUC’s Hetch Hetchy Water and Power – Joint Infrastructure renewal and replacement projects is approximately $568.1 million through FY2033. These assets are jointly funded by Water (45%) and Power (55%) sources. 

SFPUC Wastewater – Collection System / Condition Assessment Project

There are more than 80 miles of major sewers that have been in service for 100 years or more and are at the end of their useful life. This project includes cleaning and inspection of small and large diameter sewers, transport/storage boxes and collection system discharge/overflow structures. The results of the inspection program will inform the Renewal and Replacement Spot Repair and Collection System Sewer Improvements Programs (SSIP), as well as the SSIP sewer repairs. This project is a part of the on-going data gathering necessary for the Wastewater Enterprise Collection Systems Asset Management Program. 

 

The cost of SFPUC’s Collection System/Condition Assessment Projects are approximately $173.3 million through FY2033.

PW – Street Tree Maintenance and Sidewalk Repair

Public Works is responsible for maintaining approximately 125,000 street trees. Proposition E of the November 2016 ballot set aside annual funding towards this need and Public Works will have the resources to maintain street trees on an average three-to-five-year cycle, inspect all street trees annually, and make sidewalk repairs on a similar cycle.

 

The estimated cost for street tree maintenance and related sidewalk repair is $295.3 million over the next 10 years, of which $249.2 million is funded by the General Fund through Proposition E.

PW – Bridge Inspection and Repair

Public Works is responsible for the inspection and maintenance of three moveable bridges and 93 vehicle/pedestrian bridges throughout the City. Work performed under this program includes general inspection and maintenance to moveable, vehicular, and pedestrian bridges to maintain safety and proper operations, and to minimize long-term renewal costs. The Islais Creek Bridge Rehabilitation project will include bridge machine equipment and system repair and upgrades, bridge deck and fender system replacement, bridge painting, and other damage and corrosion repairs.

 

The estimated cost for the Islais Creek Bridge project is $102.6 million, with $11.8 million being funded by the General Fund, and $90.8 million from a Federal grant. The estimated cost for ongoing bridge inspection and repair is $5 million over the next 10 years. The Plan recommends $2.9 million from the General Fund towards this need. PW has also identified an additional $37.7 million in bridge rehabilitation needs.

SFPUC Hetch Hetchy – Water Infrastructure

The Water Infrastructure program provides capital funding for Renewal & Replacement (R&R) and Large Infrastructure projects on HHWP’s assets that are classified by the Water Supply Agreement (WSA) as Water. The proposed FY23/24 10-year Capital Plan includes $185.6M under the Water Infrastructure authority level which is used to fund capital improvements on the San Joaquin Pipelines, Mountain Tunnel, and other water assets.  

 

The cost of SFPUC’s Hetch Hetchy – Water Infrastructure renewal and replacement projects is approximately $185.6 million through FY2033. 

SFPUC Hetch Hetchy – Power Infrastructure

The Power Infrastructure program provides capital funding for Renewal & Replacement (R&R) and Large Infrastructure projects on HHWP’s assets that are classified by the Water Supply Agreement (WSA) as Power. The proposed FY23/24 10-year Capital Plan includes $223.3 under the Power Infrastructure authority level which is used to fund capital improvements on the power facilities such as Moccasin Switchyard, Kirkwood Powerhouse, Moccasin Powerhouse, Holm Powerhouse, 115kV and 230kV Transmission Lines, Warnerville Substation, Cherry-Eleanor Pumps, and other power assets. 

 

The cost of SFPUC’s Hetch Hetchy – Power Infrastructure renewal and replacement projects is approximately $223.3 million through FY2033. 

SFPUC Hetch Hetchy – Water and Power Joint Infrastructure

The Joint Infrastructure program provides capital funding for Renewal & Replacement (R&R) and Large Infrastructure projects on HHWP’s assets that are classified by the Water Supply Agreement (WSA) as Joint. The proposed FY23/24 10-year Capital Plan includes $568.1M under the Joint Infrastructure authority level which is used to fund capital improvements on the joint facilities such as O’Shaughnessy Dam, Canyon Tunnel, Mountain Tunnel, Moccasin Wastewater Treatment Plant, Power Distribution Lines, Cherry Dam, Buildings & Grounds, and other joint assets.

 

The cost of SFPUC’s Hetch Hetchy Water and Power – Joint Infrastructure renewal and replacement projects is approximately $568.1 million through FY2033. These assets are jointly funded by Water (45%) and Power (55%) sources. 

SFPUC Wastewater – Collection System / Condition Assessment Project

There are more than 80 miles of major sewers that have been in service for 100 years or more and are at the end of their useful life. This project includes cleaning and inspection of small and large diameter sewers, transport/storage boxes and collection system discharge/overflow structures. The results of the inspection program will inform the Renewal and Replacement Spot Repair and Collection System Sewer Improvements Programs (SSIP), as well as the SSIP sewer repairs. This project is a part of the on-going data gathering necessary for the Wastewater Enterprise Collection Systems Asset Management Program. 

 

The cost of SFPUC’s Collection System/Condition Assessment Projects are approximately $173.3 million through FY2033.

SFPUC Wastewater – Collection System / Sewer Improvement

This program maintains the existing functionality of the sewage collection system and includes planned and emergency repairs and replacement of structurally inadequate sewers. Failure of the collection system will reduce the City’s ability to handle and dispose of wastewater and stormwater which can lead to public health, safety, and environmental risks, and non-compliance with the State discharge permit. Projects are identified utilizing an asset management approach which factors in physical condition, age, location, risk, public safety, paving schedule, and other factors. This program allows for the renewal and replacement of approximately 15 miles of sewer per year. 

 

The cost of SFPUC’s Collection System/Sewer Improvement is approximately $498.6.0 million through FY2033.

SFPUC Wastewater – Collection System / Large Diameter Sewers

This is a collection of large sewer improvement projects that will rehabilitate and/or replace Large Sewers (sewers greater than 36-inches in diameter or equivalent diameter) that have the highest risk for failure. The collection of projects (or subprojects) were identified in SSIP Phase 1.

 

The cost of the SFPUC’s– Collection System/Large Diameter Sewer Improvement is approximately $491.1 million through FY2033.

SFPUC Wastewater – Sewer Lateral Improvements

The R&R Program Collection System Sewer Lateral Improvement projects consist of localized replacement/rehabilitation of sewer assets (predominantly sewer laterals). The State implementation of the Combined Sewer Overflow Policy requires that sewer utilities must have an on-going inspection, cleaning and repair program for sewer system assets to minimize raw sewage overflows.

 

The costs of the SFPUC’s Lateral Sewer Improvement Program is approximately $167.4 million through FY2033.

SFPUC Wastewater – Treatment Plants

The Treatment Plant Improvement program helps maintain the capacity and reliable performance of the Wastewater treatment facilities owned and operated by the Wastewater Enterprise. This is a continuing annual program to extend the useful life of Wastewater treatment assets including Transport Boxes, Discharge Structures, Pump Stations, Force Mains, Tunnels and Treatment Plants.

 

The projects are prioritized based upon regulatory compliance, condition assessments, operation staff recommendations, and Level of Service goals which were formally adopted as part of the SSIP. The completion of projects under the Treatment Plant Improvement program will increase reliability and efficiency of Wastewater Enterprise facilities and ensure that the performance of the treatment facilities meets the established levels of service. 

 

The cost of SFPUC’s Treatment Plants is approximately $305.0 million through FY2033.

SFPUC Wastewater – Side Stream Treatment Removal Project

This project will provide near-term interim progress on nutrient removal over the next six to seven years at Southeast Treatment Plant. Following completion of the Biosolids Digester Facility Project, a separate capital project will provide long-term nutrient removal. The costs and timing of that permanent facility is not established yet. The interim side stream nutrient removal facility will treat highly concentrated flow from the current centrifuge dewatering facility. The treated flow/effluent from this planned facility will return upstream to existing liquid treatment train on northside of Southeast Plant prior to discharging to San Francisco Bay through current outfall system.

 

The cost of SFPUC's Side Stream Treatment Removal Project is approximately $15.0 million through FY2033.

SFPUC Local Water – Water Supply Projects  

This program includes planning for local water diversification to explore alternative methods for expanding local water sources. Such sources include the Eastside Water Purification Project and Innovations for San Francisco ratepayers that highlight innovative water supplies and technologies.

 

The cost of SFPUC Water’s Local Water Supply Projects is approximately $26.4 million through FY2033.

SFPUC Water – Local Water Conveyance / Distribution System

This program includes funding to install, replace and renew distribution system pipelines and service connections for the 1,230 miles of drinking water mains in San Francisco to meet customer level of service goals for uninterrupted service. Improvements include replacement, rehabilitation, re-lining, and cathodic protection of all pipe categories to extend or renew pipeline useful life. The program also includes partial funding for new Potable Emergency Firefighting Water System pipelines as well as funding for joint-department City street improvement projects.

 

The Renew Services Program provides funding to renew assets between the water main and the customer's service connection. This program includes the Lead Component Services Program to replace any lead components for the customer’s water service line and the Water Loss Reduction Program to implement of cost-effective and comprehensive strategies to reduce water loss. The GIS distribution system mapping program and the Water Quality Distribution Systems are also included.

 

Additional projects include the New Services Connection Program, Asset Management Platform, and Town of Sunol Pipeline projects.

 

The cost of SFPUC’s Local Water Conveyance/Distribution System is approximately $650.5 million through FY2033.

SFPUC Local Water – Systems Monitoring and Control

Projects include an upgrade to the Customer Service Center System that will modernize current existing technology to optimize business processes aligning with current and future Customer Service needs and increased operational effectiveness.

Continued improvements to facilities for controlling and monitoring San Francisco's water distribution system include enhancements to the Supervisory Control and Data Acquisition (SCADA) system for remote monitoring of pressure, flow, and valve position status at key locations throughout the distribution system.

 

The cost of SFPUC’s Local Systems Monitoring and Control Program is approximately $15.5 million through FY2033.

SFPUC Local Water – Local Reservoir and Tanks Improvements

This program provides long-term funding for renewal and rehabilitation of water storage reservoirs and tanks within the San Francisco Distribution System. Projects included improvements to the Sunset South and University Mound reservoirs and replacement of coatings for roofs and tanks at multiple locations to extend the useful service life of the facilities. Major seismic improvements for the College Hill Reservoir and outlet structure are included, as well as geotechnical improvements for Lombard Reservoir.

 

The cost of SFPUC Water’s Local Tanks/Reservoir Improvements is approximately $29.8 million through FY2033.

SFPUC Local Water – Pump Station Improvements

The SFPUC’s 12 major water pump stations and seven hydropneumatics tanks that boost pressure within the San Francisco distribution system need ongoing renewal and rehabilitation. This program provides long term funding for renewal and rehabilitation of the water pump stations and hydro-pneumatic tanks that boost water pressure within the distribution system including the automation of the five pump suction valves at Lake Merced Pump Station. The program also includes improvements at the Harding Park Recycled Water Pump Station and the Bay Bridge West Pump Station.

 

The cost of SFPUC Water’s Local Pump Stations is approximately $7.1 million through FY2033.

SFPUC Water – Groundwater Project

Funding for the Lake Merced Water Level Restoration Project includes improvements to the Vista Grande Drainage Basin to address storm related flooding and diverting recycled water from the new Westside Recycled Water facility into Lake Merced to increase and stabilize lake levels.

 

 

The cost of SFPUC Water’s Local Groundwater Project is approximately $10.0 million through FY2033.

SFPUC Water – Recycled Water Project

This program includes all facilities to produce and deliver about two millions gallons per day (mgd) of recycled water for irrigation use in the western end of San Francisco. The project includes a new recycled water treatment facility consisting of membrane filtration, reverse osmosis, and ultraviolet light disinfection; a 1.1 million-gallon storage reservoir; distribution pumping facilities; and five to six miles of new pipelines.

 

The cost of SFPUC Water’s Recycled Water Project is approximately $2.4 million through FY2033.

SFPUC Local Water – Automated Meter Reading System

This program provides funding for the ongoing Automated Water Meter Program (AWMP) including meter renewal, replacement, automation, and replacement planning for the entire AWMP System by the end of its 20-year useful life (ending in 2031).  

 

The cost of SFPUC’s Automated Meter Reading System Program is approximately $40.2 million through FY2033.

SFPUC Water – Local Buildings and Grounds Improvements

This program provides funding for capital improvements at City Distribution Division facilities and structures. Projects include yard improvements to address health and safety issues and security, continuing renewal and replacement of aging assets at existing buildings and grounds including vehicle and pedestrian gates, fencing at reservoirs, and exterior lighting improvements at reservoirs and pump stations.

 

Additional funding is included for a new CDD Headquarters at 2000 Marin to address life safety standards for seismic events, building code requirements and facilities that are past useful life. The 2017 Condition Assessment found all buildings aged, water-damaged, and deficient in meeting seismic, ADA, electrical and other building code standards. Existing facilities include administrative offices, warehouse, shops, materials and equipment storage and vehicle fleet.

 

The cost of SFPUC Water’s Local Buildings and Grounds Improvements is approximately $346.9 million through FY2033.

SFPUC Local Water – Emergency Firefighting Water System

The Emergency Firefighting Water System (EFWS) delivers high-pressure water necessary to fight large fires. EFWS is jointly developed by the SFPUC and San Francisco Fire Department. SFPUC funds are planned to support the design and construction of earthquake resistant ductile pipeline to improve fire water and potable water supply reliability in the Sunset and Richmond neighborhoods. 

 

The SFPUC has planned $43.0 million from Water Revenue Bonds over the next five years to support western EFWS water supply and pipeline projects. The ESER G.O. Bond is the primary source of funding for EFWS. For additional information on EFWS, including the ESER Bond Program and strategic direction about work on the west side, please see the Public Safety chapter of this Plan.

SFPUC Regional Water – Regional Water Treatment Program

This program provides funding for improvements to the major water treatment facilities located at Tesla Portal Ultra-Violet Light Disinfection Facility, Thomas Shaft Chlorination Facility, Sunol Valley Chloramination Facility, Sunol Valley Water Treatment Plant (SVWTP), Pulgas Dechloramination facility, Harry Tracy Water Treatment Plant (HTWTP), and other locations.  Major projects include SVWTP Ozone project to install ozone treatment facilities as a long-term solution to control taste and odor events encountered in the raw water supply from both the San Antonio and Calaveras Reservoir sources. Other projects include a new polymer feed facility at the SVWTP, and other short-term and long-term improvements at SVWTP to improve regional delivery reliability by addressing various conditions and deficiencies of the SVWTP. 

 

The cost of SFPUC Water’s Regional Water Treatment Program is approximately $323.8 million through FY2033.

SFPUC Regional Water – Regional Water Transmission Program

This program provides upgrades to the Transmission System including pipeline inspection and repairs, pipeline and valve replacements, metering upgrades, corrosion protection, and pump station and vault upgrades. As part of the pipeline improvement program, funding is included to monitor, strengthen, and replace older pipeline to achieve higher level performance and reliability. Funding included for the Crystal Springs Pipeline 2 & 3 Rehabilitation will relocate and replace approximately 1.5 miles of 60-inch diameter pipe into Crystal Springs Road, reline sections of the pipe with cement mortar lining, and upgrade appurtenances to meet current standards. 

 

The cost of SFPUC Water’s Regional Water Transmission Program System is approximately $327.5 million through FY2033.

SFPUC Regional Water – Regional Water Supply and Storage Program

This program includes upgrades to reservoir dams and structures to meet State Division of Safety of Dams requirements including geotechnical work, installation of monitoring systems, and major improvements to dam spillways and structures as needed.

 

The program also includes funding for projects that increase regional water supply diversification and explore alternative methods for expanding water sources including purified water, recycled water and desalination projects.  The Daly City Recycled Water Expansion Project will provide recycled water to customers of the Regional Water System and help offset groundwater pumping in the Westside Basin. The Los Vaqueros Reservoir Expansion Project will enlarge the existing reservoir located in northeastern Contra Costa County in order to increase water supply reliability for municipal, industrial, and agricultural customers as well as provide ecosystem benefits to south-of-Delta wildlife refuges and Delta fisheries.

 

The cost of SFPUC Water’s Regional Water Supply and Storage Program is approximately $162.9 million through FY2033.

SFPUC Regional Water – Regional Watersheds and Land Management

This program supports projects that improve and/or protect the water quality and/or ecological resources impacted by the siting and operation of SFPUC facilities. Projects include the repair, replacement, maintenance, or construction of roads, fences, or trails, the acquisition of easements and/or fee title of properties, and other ecosystem restoration or public access, recreation, and education projects. 

 

The cost of SFPUC Water’s Regional Watersheds and Land Management is approximately $17.9 million through FY2033.

SFPUC Regional Water – Regional Communications and Monitoring Program

This project will provide much needed redundant emergency communications capability and increased bandwidth for secure data transfer. Specifically, it will build a microwave backbone to link the entire SFPUC regional water system from the O’Shaughnessy Dam site in Yosemite to the rest of the SFPUC sites (San Francisco, San Mateo, Santa Clara, and Alameda counties).

 

The cost of SFPUC Water’s Regional Communications and Monitoring Program is approximately $22.2 million through FY2033.

SFPUC Regional Water – Regional Buildings and Grounds Programs

This program provides funding for major improvements to the Sunol and Millbrae Yards. Sunol Yard improvements include LEED replacement facilities for maintenance shops and equipment storage, a new fueling center and administration building, re-surfacing of the yard, demolition of six dilapidated structures, and on-going renewal and replacement of worn or aging equipment. Millbrae Yard improvements include a new laboratory and office building to update the lab facilities and consolidate staff from the Rollins Road facility, maintenance shop, and equipment storage, demolition of a large unused abandoned building, a new parking lot, and a new vehicle wash site.

The upgrades address occupational safety, reliability, and functional regulatory compliance.

 

The cost of SFPUC Water’s Regional Buildings and Grounds Programs is approximately $249.5 million through FY2033.

SFPUC Regional Water – Long-Term Monitoring & Permit Program

The purpose of this program is to meet the long-term monitoring and permit requirements associated with capital projects and the operation and maintenance of the SFPUC water supply system and watershed/right-of-way lands within the Bay Area. Projects with long-term monitoring required by environmental permits include Water System Improvement Program (WSIP) related environmental mitigation and permit requirements (i.e., Bioregional Habitat Mitigation Program) and non-WSIP capital projects.

 

The cost of the SFPUC Water Regional Long-Term Monitoring & Permit Program is approximately $31.6 million through FY2033. 

 

The Hetchy Water Renewal and Replacement Program

Many Hetch Hetchy Water and Power facilities and system components are aging. Many have reached or exceeded their useful life. The condition of these facilities and equipment must be or has been assessed. Proposed projects are evaluated and prioritized based on risk (financial/criticality, safety and regulatory), efficiency of operations, and to provide a safe working environment for employees working in remote areas.

 