Public Safety
Fireboat Station at Pier 22 1/2
Fireboat Station at Pier 22 1/2

San Francisco Fire Department

  • Completed the floating fire station project to replace Fireboat Station 35 at Pier 22 1/2.
  • Secured two adjoining parcels of land for the Department’s new Fire Training Facility with planning and design work currently underway.
  • Completed construction on the new Ambulance Deployment Facility at 2241 Jerrold Avenue. 
  • Completed generator replacement at Station 2, with a notice to proceed on replacement at Stations 37 and 44. Design, permitting, and bid processes underway for emergency generator replacement projects at Stations 14, 18, and 19.
  • Completed Station 14 HVAC system comprehensive upgrade and replacement.
  • Completed hose tower removal work at Fire Stations 6, 11, 12, 21 and 38.
  • Completed shower improvements at Station 34.
  • Progressed on Emergency Firefighting Water System (EFWS) projects in collaboration with the Public Utilities Commission. Anticipated completion of construction on Pump Station 2 in early 2023. EFWS pipeline construction completed on parts of 19th Avenue as well as new developments in Mission Bay, with anticipation of construction completion in April 2023 of the Clarendon supply pipeline.  

San Francisco Police Department

  • Completed facility fire panel upgrades in Richmond, Mission, and Taraval stations.
  • Moved staff into the newly completed Forensic Services Division/Traffic Company Evans building. 
  • Installed security fencing for department/fleet vehicles at Pier 96, Academy and Morris lot.
  • Installed security camera upgrades for Taraval, Egbert, Police Headquarters.
  • Completed academy sewer replacement, redirecting incoming water from above ground.
  • Completed mechanical, electrical, and plumbing work at Bayview and Tenderloin stations.
  • Initiated Mission Police station structural improvement project.

Other Public Safety Accomplishments 

  • Funded the renovation of the County Jail #2 kitchen with the construction of this project to be completed and fully operational by November 2022.   
  • Completed the Sheriff's Department Facilities Master Plan, documenting current and future capital needs across its jails and other facilities.
  • Completed Sheriff’s Department Infrastructure Improvement Study.
  • Completed the update to a fully integrated electronic security system throughout County Jail #2. 
  • Completed engineering phase of High-Pressure Boiler Replacement Project at Juvenile Probation Administrative Building.