Project Name |
Description |
---|---|
PW – Streetscape Improvement Program |
The Streetscapes Program enhances neighborhood streets, alleys and plazas across the City through safety, economic, and beautification improvements. Typical improvements include Vision Zero bulb-out improvements, transit efficiencies, street tree planting and other greening enhancements, site furnishings, lighting upgrades, as well as such pedestrian and bicycle safety features as pedestrian islands, bike lanes, crosswalk enhancements and other traffic-calming measures. The estimated cost for the Streetscape Improvement Program is $971.3 million over the next 10 years. |
PW – Utility Undergrounding |
Overhead utility wires and related infrastructures are potential public safety hazards and a visual blemish on San Francisco’s vistas. This project would involve relocating overhead utility wires underground. Undergrounding utilities reduce the frequency of needed maintenance but require a substantial up-front investment. Generally, undergrounding costs roughly $8 million per mile. The estimated cost to underground utilities across the City over the next 10 years is more than $1.3 billion. |
SFPUC – Water Enterprise |
|
SFPUC – Hetchy Water |
|
SFPUC – Wastewater |
Wastewater deferred projects total over $500 million and include projects that are dependent on other non-SFPUC planned investments, projects that require further study into flood resilience, sea level rise and climate adaptation, and renewal projects that have a lower risk of failure. |
SFPUC – Power Deferred Projects |
The largest deferred project for the Power Enterprise is a new substation for SF International Airport, since this project is focused on redundancy and resilience and was deemed to be less urgent. |