Streets and Rights-of-Way
-
Repaved and maintained 1,011 street blocks, maintaining the City's Pavement Condition Index at 75 for 2024.
-
Constructed a total of 1,558 curb ramps.
-
Inspected 109 and repaired 31 street structures, such as bridges, retaining walls, plazas and public stairways.
-
Inspected 15,775 trees, planted 2,766 trees, and maintained 26,526 trees.
-
Repaired more than 77,175 square feet of sidewalks, equivalent to 28 blocks.
-
Completed Phase 1 of Better Market Street, focused on the stretch between Fifth and Eighth streets, including ADA-compliant curb ramps, upgraded traffic signals, repaved roadways, new trees, benches, sidewalk pavers, and bike racks.
Public Utilities Commission
-
Completed several Water projects including, the Rollins Road Building Renovation, Harry Tracy Water Treatment Plant Filter Replacement, Corrosion Control Phase 2, Watershed Environmental Improvement, San Francisco Westside Recycled Water Pump Station, San Francisco Groundwater Supply, Emergency Firefighting Water System Pump Station No. 2, Clarendon Supply, and Reservoir and Irrigation projects.
-
Replaced 14 miles of water mains and completed 9 water main replacement construction contracts in San Francisco.
-
Replaced 22 miles of main sewer work and awarded contracts for another 18 miles towards the completion of the Sewer System Improvement Program (SSIP), now at nearly 53% completion.
-
Commenced operation of New Headworks at Southeast Plant.
-
Completed several Wastewater projects including Wawona Area Stormwater Improvements, Mariposa Pump Station, Cargo Way Flush Line and Baker Street Combined Sewer Discharge Baffle Improvements, and three Large Diameter Sewer Improvements projects.
-
Advanced construction on several Wastewater projects including the Biosolids Digester Facilities Project, the Oceanside Water Pollution Control projects, the Southeast Water Pollution Control projects, the Westside Pump Station Reliability Improvements project, and the Treasure Island Water Resource Recovery Facility.
-
Started construction on the Channel Pump Station Bar Screens Replacement project.
-
Completed the second and third of five annual Hetch Hetchy water system shutdowns for construction of the Mountain Tunnel Improvements Project.
-
Completed several projects at O’Shaughnessy Dam including Fall Protection Improvements, Spillway Access, and installing two large-diameter gate valves.
-
Made significant progress on the San Joaquin Pipeline (SJPL) Tesla Valve Replacement, the SJPL Valve and Safe Entry, and the Moccasin Powerhouse and GSU Rehabilitation projects.
-
Completed emergency actions and repairs along the HHWP system associated with
the 2023 January Winter Storm and 2023 March Winter Storm projects, including major repairs along Hetch Hetchy Road and Cherry Lake Road. -
Completed eight metered Wholesale Distribution Tariff (WDT) interconnections for projects exceeding 10kW.
-
Completed the installation of three solar electric projects.
-
Energized the Bay Corridor Transmission Distribution substation, as well as major phase for redevelopment projects at Pier 70, Mission Rock, Treasure Island, and Yerba Buena Island.
-
Converted 626 decorative high pressure sodium luminaires to LEDs on the island along the Embarcadero.
![]() |
![]() |