Deferred Projects
Project Name |
Description |
---|---|
DPH – ZSFG Building 80/90 Renovation & Seismic Retrofit |
Constructed in 1934, Buildings 80/90 are seismically deficient red brick buildings at the ZSFG campus that house HIV, Behavioral Health and Substance Abuse clinics, staffed by both UCSF and DPH providers. These buildings do not meet UC seismic requirements for UC staff occupancy and must be upgraded by 2030 or UC staff will not be allowed to continue to occupy. Retrofitting Buildings 80/90 would allow DPH to relocate both DPH and UC staff into seismically safer buildings. The total project cost is estimated to be over $200 million. |
HSH – 1001 Polk Replacement Shelter |
HSH is coordinating with Public Works to design and program an emergency adult shelter at 1001 Polk Street to replace the existing shelter and maximize the footprint of the site. Prior to the development of Measure B on the November 2024 ballot, HSH was planning to demolish the existing adult shelter at 1001 Polk, rebuild the site as a family shelter, and vacate the existing family shelter at 260 Golden Gate (a City-owned building with an SHR 4). The project was designed to include wrap-around services and provide a clinic, day care and afterschool programs, outdoor playground, community and meeting spaces, and flex dormitory space for emergency use. The total project cost as scoped was estimated to be $115 million. |