DPH – LHH Pharmacy Code Compliance Upgrades |
This project is a State licensing and certification regulatory requirement. Code upgrades are required to compounding hood enclosures to comply with USP800 by 2018.
The estimated project cost is $450,000. |
DPH – LHH Second Floor Service Corridor Access Control |
This project is an OSHPD requirement. Elevators need to have access control, which is not currently in place. Control is needed at three points – the adjacent administration building and second floor corridors from North and South towers.
The estimated project cost is $400,000. |
DPH – ZSFG Building 2 Cooling Towers Replacement |
The existing system is over 30 years old and a recent study by an engineering firm established the need for replacement.
The estimated project cost is $7.2 million. |
DPH – ZSFG Building 2 (Service Building) NPC-4 Seismic Upgrade |
Building 2 provides utilities to acute care services, but does not currently meet all the seismic performance requirements needed to serve acute care services. A seismic upgrade to Non-structural Performance Criteria level 4 (NPC-4) is required.
The estimated project cost is $1.2 million. |
DPH – ZSFG Building 5 Kitchen Upgrade and Remodel |
This kitchen at General Hospital was last updated in 1982, and there is flooring, ceiling, and electrical work required throughout. In addition, food storage areas require renovation and upgrade. This is an Office of Statewide Health Planning and Development (OSHPD) project.
The estimated project cost is $3.4 million. |
DPH – ZSFG Building 5 New Chiller to Support IT Infrastructure |
Existing and planned IT Infrastructure requires dedicated cooling, and is experiencing failure due to cooling deficiencies within IT closets.
The estimated project cost is $1.2 million. |